Earlier this week, the construction workers put up a sample piece of the new copper that will become the dome. They wanted to make sure they had the measurements correct and that the copper would fit properly over the curvature and battens before they cut enough for the whole building (or even a whole side). It’s not the green patina like the weathered gutters below – this is a glimpse of what the roof looked like when General Wallace first built the Study, and what it will look like when the Study Restoration Project is finished in the spring!
Because this was only a sample, they took the copper back to the shop and re-covered the wooden dome structure with the black weatherproof sheeting.