Workers removed the copper from the south side of the Study earlier this week. That leaves two sides without copper and two sides still covered. You can see the wooden decking and battens, just like what they found on the east side, before they installed the weatherproof barrier. From their […]
Blog
It’s been a week of tantalizing research leads. One of the more interesting leads walked in the door on Thursday morning. Mr. Johns from Tennessee came for a visit at the Museum and told us that during the Civil War, General Wallace was in Lavergne, Tennessee, near Murfreesboro when he […]
The front steps of the Study got reset today after their “vacation” on the lawn. Construction workers relaid support underneath the steps – instead of the piles of loose bricks – and then moved the steps back in place. Years ago, a previous crew apparently patched a sizable gap between […]
wabashvolunteers 011, originally uploaded by WallaceStudy. Athlete volunteers from Wabash College move picnic tables on the grounds of the General Lew Wallace Study & Museum as part of their Wabash Day community assistance activities.
wabashvolunteers 014, originally uploaded by WallaceStudy. Athlete volunteers from Wabash College help scrape paint from the 1875 Carriage House on the grounds of the General Lew Wallace Study & Museum as part of their Wabash Day community assistance activities.
Earlier this week, the construction workers put up a sample piece of the new copper that will become the dome. They wanted to make sure they had the measurements correct and that the copper would fit properly over the curvature and battens before they cut enough for the whole building […]
Walk in the footsteps of a literary giant with The Town that Lew Knew, a free architecture walking tour of Crawfordsville. We’ll see buildings in the neighborhood and business district that were here when Wallace walked the leaf-lined avenues. The tour starts at 3:00 p.m. Saturday, October 9, at the […]
Ratio Architects from Indianapolis began the paint analysis by revealing what lies underneath the current paint layer. This preliminary test uncovered small pieces of the walls in different places in the Study: the entryway, under the benches by the fireplace, along the flowered frieze, and more. Surprise! The entryway of […]
The bad news about the Study Restoration Project is that two days after they removed an entire side of the roof, it poured rain for hours! We haven’t had rain in weeks – maybe the best way to make sure it’s wet out is to start major construction. The good […]
It’s the moment we’ve all been waiting for: workers removed an entire side of the Study roof! Workers went up more than 30 feet in a lift truck to cut the copper roof into manageable pieces. Then they pried the pieces from the underlayment… and put them in the basket […]