To reset the front steps of the Study, workers removed caulking and sealant from around the cracks and gaps (we posted pictures last week), and then looped a harness around each step to remove them with the lift truck. Pulling the stop step away from the building. Completely removed! One […]
Daily Archives: September 24, 2010
1 post